← All journal entries

A more personal site and a few practical jobs (16–22 November 2026)

A new look for this site, getting PDF information back into Tape, and adapting a fitting for the van’s conduit.

This site got a more personal look this week. I changed the colours to plum and warm paper with a softer green, put my own mark in the header, and gave the About page a bit more of the van and the things I build. The homepage now puts the latest journal entry alongside a few bookmarks. The refresh went live on Monday.

I also connected the site’s contact form and analytics to Indigo Link, the service I’ve been building for handling those across my websites. I tested the whole enquiry route, including opening the confirmation email and checking that the enquiry arrived in Tape. There were a few details to sort out around the confirmation page, but that flow is now working.

PDFs into Tape

Ion Loom already handled extracting text and making previews from PDFs. This week I worked on connecting that to my personal documents in Tape. The first successful run put the extracted text, a preview and fields such as the issuer, document date and summary back on the record.

Testing turned up a problem with the preview workers keeping their slots after a document had finished. Even adding one document at a time could eventually fill the available slots. I changed how they’re reused and recovered a missing preview, though I still want to keep an eye on how it behaves with more documents.

I am doing this with a view to moving my main document storage into Tape now Tape has a better mobile app.

A fitting that nearly fitted

On the van side, I worked on a conduit fitting in Fusion. The 20 mm version was close, but my conduit is actually 21 mm, and I needed more thread to reach through the mounting surface and take the nut. That small change ended up needing a larger thread and a matching nut as well.